Download Print this page

EBARA DSC4 Series Operating Instructions, Installation & Maintenance Manual page 3

Submersible wastewater, sewage pump

Advertisement

INSTRUCTION MANUAL
2. Acceptance Inspection
Upon arrival of the pump –
(1) Check the nameplate information for agreement with specifications in respect
to model identification, head, pumping capacity, speed, output, voltage and
frequency.
(2) Check the pump has not been damaged during shipment and all plugs and
fastening bolts properly tightened.
(3) Check accessories and spare parts against the packing list.
If any problem is found, contact your dealer.
3. Installation
3.1 Foundation
Place concrete to build up the floor and discharge elbow foundations to the values
shown in installation drawing. The discharge elbow foundation must have sufficient
size and strength to support the weight of the pump body, submersible motor and
accessories plugs the weights of the discharge pipe, and to absorb vibrations and
impacts resulting from operation. Usually, it should weigh more than seven times the
pump weight.
3.2 Floor Frame (Fig. 1, 2 and 3)
Install a cable lead-out elbow and a floor frame on the floor over the pump pit. Attach
a guide pipe holder securely to the floor frame with bolts. As the guide pipe must be
installed vertically (with a tolerance of 1mm (0.04in) or less per 1m (3.3ft)), carefully
check the positional relationship between the floor frame location and the discharge
elbow foundation. (See Fig. 1
PM32U
)
Cable lead-out elbow
*
Fig. 1
P.2

Advertisement

loading