If you are installing a Cross Linked (CLM) library, each cabinet must have appropriate
space in front and in back of it, and it must have about 1 inch (2.5 cm) between it and
its adjacent cabinet(s).

Floor clearance

The library has a floor clearance of 0.75 inch (19 mm). Place the library on a level,
uncarpeted floor free of defects.

Floor strength and inclination

The floor at the installation site must be rated at 250 lb/ft
sufficient to support a fully loaded library.
The floor must be level to within 0.25 inch (6.4 mm) over a 6 ft by 6 ft (1.83 m by
1.83 m) area.
Ventilation
Do not place the library directly over any cooling vents. Placing the library over cooling
vents will result in an "out of temp" reporting in the library log.

Power and grounding

For the United States and Canada, one or two UL/CSA-certified power cords are
supplied with each library. Each power cord uses a 14/3 SJT cord, a L6-20P plug, and
an IEC-C320 C19 female connector (see
1
2
The library is rated 200-240V~, 50-60Hz.
Connect to wall outlet plug NEMA L6–20P
Connects to library power supply connector IEC-C320 C19
Figure 2 Power supply cord
HP StorageWorks ESL E-Series Tape Library unpacking and installation guide
(1221 kg/m
2
Figure
2).
1
2
). This is
2