Adjustment Procedure - Tektronix 7D12 Operator's Instruction Manual

A/d converter
Hide thumbs Also See for 7D12:
Table of Contents

Advertisement

M2 Operating Instructions-7D12 Operators
.01%~--------------~----------------~--------------~r---------------~
>
.1%
ct
u
w
Q
..J
ct
Z
C)
iii
u
1%
ct
lAo
0
W
C)
ct
I-
Z
w
U
a:
w
10%
0.
100
jJS
1
ms
10
ms
100
ms
TIME LAPSED AFTER STEP FUNCTION
Fig. 3·5. Percentage of signal decay in AC COUPLING mode.
than 20 volts; pulse top flatness, within 0.5% after
750 nanoseconds; negative-going square-wave referenced to
zero volts.
Recommended
equipment:
Tektronix
Type
106
Square-wave Generator.
2. Precision DC voltage supply: Output, 20 volts DC;
accuracy, within 0.05%; ripple, less than 1 millivolt.
Recommended equipment: Fluke 343A DVM Calibrator.
Adjustment Procedure
1. Insert the M2 Module into the 7D12 AID Converter
and install in the left vertical compartment of a 7000-series
oscilloscope.
2. I nstall a delaying time-base in the A Horizontal
compartment and a time-base into the B Horizontal
3-6
compartment of the oscilloscope. (One dual time-base such
as the 7B53A can be substituted in place of the two
time-bases.)
3. Connect the oscilloscope to a power source that
meets the voltage and frequency requirements of the
oscilloscope power supply.
4. Turn the oscilloscope power on and allow about
twenty minutes warmup time.
5. During the warmup period, set the controls as
follows.
A Intensity
Vertical Mode
Horizontal Mode
A Trigger Source
Oscilloscope
Counterclockwise
Left
A
Vert Mode
®

Advertisement

Table of Contents
loading

This manual is also suitable for:

M1M2M3

Table of Contents