Base Installation: Flat Floor - Harmar Mobility AL215 Axis I Installation & Owner's Manual

Inside lifts
Table of Contents

Advertisement

INSTALLER
INSTALLATION
BASE INSTALLATION:
FLAT FLOOR
After you know the lift position from the trial fit
procedure, you are ready to drill three 3/8" holes in
the locations you marked.
1. Drill Pilot Holes
Choose a safe location to drill a single pilot
hole from above in one of the three marked
locations.
Look under the vehicle and measure the
specified distance from the pilot hole.
If all is clear in that area continue to drill in
remaining locations.
Inspect all three pilot holes under the
vehicle.
If all clear, drill 3/8" holes in pilot locations.
[Figure 14-1]
Avoid vehicle wiring, fuel lines,
fuel tanks, spare tires, etc. when
drilling.
CAUTION!
2. Fasten Base
When holes are drilled, fasten base to vehicle
floor using supplied hardware in the hardware
pack. Be sure to tighten all fasteners. [Figure 14-2]
Special Cases
Storage compartment or well can potentially affect
lift placement. Most of these situations can be
managed with the help of an All Thread Kit.
[Figure 14-3]
Spare Tire Storage
If the spare tire is stored under the floor, be sure
that the base can be bolted through a steel floor or
frame.
14
| www.harmar.com | 800-833-0478
Telescoping Legs
(BA-00 shown)
+
+
16"
23"
B A -
© 2016 Harmar All Rights Reserved
+
23"
16"
+
Figure 14-1
0 0
Figure 14-2
Figure 14-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents