Disassembly and Assembly

3.2.4 Main Controller Board Removal

Refer to Figure 3-6.

3.2.4.1 Shield Frame Removal

1.
Remove the outer covers. (Refer to Section 3.2.1.)
2.
Remove 15 CBS screws (3X6) securing the shield frame.
3.
Remove the shield frame.

3.2.4.2 C207 MAIN Board Removal

1.
Remove the outer covers. (Refer to Section 3.2.1.)
2.
Remove the shield frame. (Refer to Section 3.2.4.1.)
3.
Remove 4 CCS screws (3X6) securing the connector panel of the C207 MAIN Board.
4.
Remove 6 CBS screws (3X8) securing the MAIN Board.
5.
Remove the C207 MAIN Board.
3-12
Figure 3-8. Shield Frame Removal
Figure 3-9. C207 MAIN Board Removal
EPL-N2000 Service Manual
Rev. A