Fujitsu ETERNUS DX8100 S3 Site Planning Manual page 63

Hybrid
Hide thumbs Also See for ETERNUS DX8100 S3:
Table of Contents

Advertisement

2.
Rack Installation Specifications
Rack Installation Requirements
Installing 7 to 16 DEs for Each Node
This section describes the required (estimated) length of cable for configuring seven or more DEs connected to
each node with 12 CEs installed.
The supplied cable can be used for connecting between the FE and CE#0.
A 3m or longer QSFP cable and a 5m or longer management cable are required between the FE and the CEs in
the first to third expansion rack (or up to Expansion Rack#2).
A 10m or longer cable is required between the FE, and the CEs in the fourth and later expansion racks (or
Expansion Rack#3 and later).
If expansion racks are installed in a pattern that is different from the standard installation rules, the cables in
the connection examples may not be long enough to connect. If expansion racks are installed to the left
(when facing the rear) of the base rack, the 3m QSFP copper cable cannot connect between the base rack and
the third expansion rack (or Expansion Rack#2). The 10m QSFP active optical cable is required instead.
FUJITSU Storage ETERNUS DX8100 S3/DX8700 S3/DX8900 S3 Hybrid Storage Systems Site Planning Guide
63
Copyright 2020 FUJITSU LIMITED
P3AM-9422-13ENZ0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx8700 s3Eternus dx8900 s3

Table of Contents