Figure 54 Remove the cable management brackets from the A10508-V
(1) Loosen the screws that fix the cable management
brackets to the chassis
Repackaging the switch chassis
To repackage the switch chassis:
As shown in
1.
brackets on the pallet base of the wooden carton.
Fix the screws shipped with your switch to the chassis through the L-type brackets.
2.
Figure
55, align the screw holes on the two sides of the chassis bottom to the L-type
(2) Remove the cable management brackets
93