Installing The Base Unit - Toshiba nv Series Instruction Manual

Light controller unit
Hide thumbs Also See for nv Series:
Table of Contents

Advertisement

Chapter 2 Installing/Uninstalling
2.4

Installing the Base Unit

Pay attention to the following items to install the base unit. For installing the base unit for
TC-net I/O, refer to "TC-net I/O Instruction Manual" (6F8C1240). For installing the
intelligent I/O, refer to "Intelligent PI/O Instruction Manual" (6F8C0779).
■ 
(1) The controller unit is not dust-proof. Store it in the control board that takes
(2) Avoid installing it directly above devices that generate lots of heat (such as heater,
(3) Do not install it on the same board as the high-voltage devices.
(4) Put it off the high-voltage wire and the power wire at least 200mm.
(5) Reserve at least 70mm space for ventilation around the base unit and the fan unit.
(6) Place the type2 light controller as far from the high-voltage and power equipment
(7) Install the base unit and the fan unit on the vertical panel surface.
(8) Use four of M4 screws to install the base unit and the fan unit firmly (rough
(9) The dimension to install the base unit is shown in the following figure.
28
6F8C1575
Precautions for installing the base unit for type2 light controllers
dust-proof into consideration as much as possible.
transformer and large capacity resistor).
as possible, or provide an iron plate in between for isolation.
indication of tightening torque: 1.47N・m=15kgf・cm).
Figure 2-3    Dimension to install the base unit
402.5
416.5
2 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Type2

Table of Contents