Preventive Maintenance - Eaton 93PM G2 Series User And Installation Manual

50 – 360 kva ups
Hide thumbs Also See for 93PM G2 Series:
Table of Contents

Advertisement

Eaton 93PM G2 UPS 50 – 360 kVA
Figure 43: Warning label
Since each battery string is an energy source in itself, opening the battery circuit
breaker does not de-energize the voltage within the battery string.
Do not attempt to access any internal area of the battery string. Voltages
are always present in the battery strings. If you suspect that a battery
string needs service, contact your service representative.
Obey these precautions when working on or around batteries:
Remove watches, rings, or other metal objects.
Use tools with insulated handles.
Wear rubber gloves and boots.
Do not lay tools or metal parts on top of batteries or battery cabinets.
Before you connect or disconnect a terminal, first disconnect the charging
source.
Determine if the battery is inadvertently grounded. If it is, remove the source
of the ground. Contact with any part of a grounded battery can result in an
electrical shock. The likelihood of such a shock is reduced if such grounds
are removed during installation and maintenance.
When you replace batteries, use the same number of sealed, lead-acid
batteries.
Discard batteries according to your local codes for disposal requirements.
8.3

Preventive maintenance

The UPS system requires very little preventive maintenance. However, inspect
the system periodically to verify that the units are operating normally and that the
batteries are in good condition.
© Eaton Corporation plc 2020. All rights reserved.
DANGER
Revision: 001
Document ID: P-164000956
User's and Installation Guide
111
(141)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents