Procedure - Siemens CS1140 Commissioning

Fire detection system. commissioning 'en12094-1 compliant single-area extinguishing system'
Hide thumbs Also See for CS1140:
Table of Contents

Advertisement

Procedure

3
Procedure
10
Building Technologies
Fire Safety
Step
1. Preparation of electronic modules
Set switch and resistors on E3G080
Set switches and resistors on B3Q440
Insert inscription strips
2. Initial switch-on
First set switch 'S1' on the E3G080 to 'ON'
Note: 'S1' > 'ON' = hardware and software blocking of all E3G080 outputs
3. Measure voltage at E3G080
Check voltage of all peripheral equipment connected to the E3G080
Ensure rest potential throughout the area
4. Initialize automatic calibration function on E3G080
This function calibrates the valve current and registers and stores which lines
are connected.
First ensure that:
no signalling contact is in active mode
all lines are connected including the line termination
the impedance range chosen for the valve lines is correct ('R60/61')
Press key 'S4' (set switch 'S1' to ON)
Meaning of LEDs H1....H4 on E3G080
5. Performance check
First ensure, that the user functions have been set correctly
Carry out 'Normal operating condition' control function
Carry out individual control functions
Note:
Functions 'Extinguishing REVISION' und 'Extinguishing TEST'
Extent of available functions in SECTION list
6. CE identification
Complete the installation plate Extinguishing with a water proof marker
Directly apply the installation plate Extinguishing next to the installation plate of
the fire control panel
In some countries, with CO2-extinguishing systems with a risk to life (CO2-
IMPORTANT
concentration >5Vol%) a so-called 'Concidence of the vital functions is re-
quired (vital functions must be guaranteed).
Examples
an electrical and a mechanical/pneumatic delay device in AND operation
for this purpose the E3G080 has 2 different valve activating outputs
Compulsory pre-warning also functions in the event of a fault (e.g. caused by
lightning etc.)
use pneumatic sirens
When commissioning, ensure that the local requirements are fully complied with the norm
EN12094 1. If the system operator asks for a concept which deviates from the regulations, then he
must bear the responsibility.
Detail
informatiton
chapter
4.1
4.3
4.4
4.1
5.1
5
4.1
5.2
6.1
7.1
7.2
8.1
8.2
9
009853_b_en_--
01.2013

Advertisement

Table of Contents
loading

Table of Contents