Doosan Power Train D50S-5 Specifications Systems Operation Testing & Adjusting Disassembly & Assembly page 67

Hide thumbs Also See for Power Train D50S-5:
Table of Contents

Advertisement

Assembling OCD Brake
7. Assemble Brake plate and disc.
a. Assemble 5 plates(1) and 4 disks (2) with spline
collar (3) and then, lock with snap ring (4).
b. Assemble spline collar joined with plates and
disks, and drive shaft (5) to axle housing (6).
- Before assembling, clean all of the parts
completely and remove burrs.
c. After assembling plate and disk, confirm that
the tolerance with axle housing surface is
1.3~2.7mm
d. Apply loctite #5127 on spindle side of alxe
housing (6).
Power Train
8. After assembling sun gear (9) to axle shaft, fix it
with snap ring (10). Assemble axle shaft to the
axle assembly.
Apply grease on the shaft where bushing contcts.
Apply grease to teeth parts of planetary gear.
9. Assemble internal components of planetary
carrier in the reverse order of disassembly.
66
Disassembly and Assembly

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents