21. Mount gear (72) on the intermediate gear.
Assemble bearing cone (71) with press.
Assemble the bearing cone (73) on the opposite
side in the same manner.
Bearings and gear must be assembled at their
due positions as marked during disassembling.
22. Assemble the spacer (77) and bearing cone (76)
with the output shaft assembly.
Take care not to tear O-ring in the spacer when
assembling the spacer.
Power Train
CAUTION
CAUTION
23. Install tube (45) on the transmission case with
plastic hammer.
24. Assemble backward shaft and input power shaft
in the following procedures.
25. Install the backward driving shaft (42) carefully
at its due position of the transmission case.
26. Set the transmission case at correct position,
install input power shaft assembly (44) carefully,
and turn the gear until the tooth face aligns with
the gear on other shaft assembly.
27. Assemble the oil collector and bolt at their due
places, in order to install on the output shaft
assembly (70).