Doosan Power Train D50S-5 Specifications Systems Operation Testing & Adjusting Disassembly & Assembly page 64

Hide thumbs Also See for Power Train D50S-5:
Table of Contents

Advertisement

2. Lead brake cable through the provided borehole
of the brake carrier and hook it on the pressure
rod of the brake shoes. Assemble brake shoes,
compression springs and tension springs as
described in the Dosassembly Section in reverse
order.
Assembling Wheel Hub
1. Insert bearing into wheel hub. Confirm that the
bearing and wheel hub contact completely.
Apply grease or oil to shaft seal and then,
assemble it from the direction of outre side of
wheel hub.
Power Train
CAUTION
2. Install wheel hub assembly to the tube flange of
axle completely. Install bearing cone.
3. Insert shim, fix the torque plate and ring gear with
snap ring and assemble them to the axle tube.
Apply loctite #271 or #277 to thread of bolt (2) and
then, assemble at the tightening torque of
147~167 N•m (109~123 lb•ft). Apply grease on
the bushing
4. Assemble sun gear (3) to axle shaft and fix it with
snap ring (3). Assemble axle shaft to the axle
assembly. Apply grease on the shaft where
bushing contcts. Apply grease to teeth parts of
planetary gear.
63
Disassembly and Assembly

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents