Doosan Power Train D50S-5 Specifications Systems Operation Testing & Adjusting Disassembly & Assembly page 62

Hide thumbs Also See for Power Train D50S-5:
Table of Contents

Advertisement

Assembly of Differential
1. Assemble thrust washer, side gear and spider
gear and then, install them to the differential
housing. Apply grease on the bevel gear and
thrust washer.
2. Assemble differential housing.
Power Train
Check marks on the housing.
Match two marks at the same position.
3. Tighten 12 bolts (1) to the differential housing.
Apply loctite #271 or #277 on the thread of bolt.
• Tightening torque : 49~74 N•m (36~54 lb•ft)
4. Assemble ring gear by tightening 12 bolts (2).
Apply loctite #271 or #277 on the thread of bolt.
• Tightening torque :122~142 N•m (91~105 lb•ft)
5. Install differential assembly onto the carrier. Place
the bearing cup and screw into the housing.
61
CAUTION
Disassembly and Assembly

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents