5. Assemble internal components of planetary
carrier in the reverse order of disassembly.
6. Install planetary carrier assembly to wheel hub
and tighten bolt.
• Tightening torque : 25~39 N•m (18~29 lb•ft)
Power Train
7. Assemble wheel hub and tighten plug (1).
• Tightening torque : 35~59 N•m (25~44 lb•ft)
8. Install brake drum and tighten the bolts.
Assembling Wheel Hub Ass'y (OCDB)
1. Insert bearing into wheel hub. Confirm that the
bearing and wheel hub contact completely.
Apply grease or oil to shaft seal and then,
assemble it from the direction of outre side of
wheel hub.