Doosan Power Train D50S-5 Specifications Systems Operation Testing & Adjusting Disassembly & Assembly page 57

Hide thumbs Also See for Power Train D50S-5:
Table of Contents

Advertisement

Removal and Strip Down of Brake
1. Remove 2 tension springs with the aid of pliers or
a screwdriver
2. Squeeze, unhook and remove compression
springs. Remove spring. Unhook and remove the
two brake shoes. Then, unhook the brake cable at
the pressure rid of the brake shoes and remove it.
3. Loosen 16 cylindrical bolts. Detach and remove
brake plate from axle flange.
NOTE : Make the same steps on the second side of
the wheel hub if required!
Power Train
Removal and Strip Down of Axle
Housing
1. Loosen 12 bolts (1) and then, remove carrier from
the housing by using a lifting machine.
2. For the reassembly, check rolling resistance and
record it. After loosening 2 bolt (2), remove
backing plate (3).
3. Before removing differential assembly from carrier
(4), check the location of cap (5) and mark it for
reassembly.
4. Remove 4 hexagon bolts (6) and cap (5).
56
Disassembly and Assembly

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents