Doosan Power Train D50S-5 Specifications Systems Operation Testing & Adjusting Disassembly & Assembly page 45

Hide thumbs Also See for Power Train D50S-5:
Table of Contents

Advertisement

7. Unscrew 5 bolts (11) from the Stator Hub (12)
fixed on the Bearing Plate (14), and isolate them
from the plate. Use rubber hammer to protect
Stator Hub from damage.
8. Isolate 4 socket bolts (26) from the bearing plate
(14), disassemble flange pump (25).
Isolate socket bolt (28) and 4 socket bolts (30)
from the flange pump. Isolate charging pump (29)
and gasket (27). Disassemble Gear-P.T.O Output
(23) and ball bearing, and isolate elbow (24).
Power Train
9. From the bearing plate (14), isolate 2 thrust
washers (31), needle bearing (32), and Gear-
P.T.O Idle (33).
10. Disassemble 2 bolts (35), 9 bolts (36), and valve
gasket (34).
11. Unscrew 8 bolts (37) and 5 socket bolts (38)
from transmission. Isolate valve plate (69) slowly
44
Disassembly and Assembly

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents