Termination Locations; Vertical Vent Cap Termination - kozy heat ALPHA 36S Installation And Operation Manual

Direct vent
Table of Contents

Advertisement

6.0 TERMINATION LOCATIONS

6.1 Vertical Vent Cap Termination

WARNING: This appliance must not share or be connected to a chimney
flue serving a separate solid-fuel burning appliance.
Approved cap
Approved
vent pipe
Figure 6.1, Vertical Vent Cap Clearance
Roof Pitch
Flat to 6/12
Over 6/12 to 7/12
Over 7/12 to 8/12
Over 8/12 to 9/12
Over 9/12 to 10/12
Over 10/12 to 11/12
Over 11/12 to 12/12
Over 12/12 to 14/12
Over 14/12 to 16/12
Over 16/12 to 18/12
Over 18/12 to 20/12
Over 20/12 to 21/12
#ALP-36S R.7 January 2020
Lowest
discharge
opening
Minimum
12" (.30m)
H
H
x
12
Roof pitch = x/12
H - Minimum height from roof to lowest
discharge opening
Minimum height (H) from roof
Feet
Meters
1.0
1.25
1.5
2.0
2.5
3.25
4.0
5.0
6.0
7.0
7.5
8.0
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
0.30
0.38
0.46
0.61
0.76
0.99
1.22
1.52
1.83
2.13
2.27
2.44
TERMINATION LOCATIONS 25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp-36s

Table of Contents