6.0 TERMINATION LOCATIONS
6.1 Vertical Vent Cap Termination
WARNING: This gas appliance must not be connected to a chimney
serving any other appliance.
Figure 6.1, Vertical Vent Cap Clearance
Roof Pitch
Flat to 6/12
Over 6/12 to 7/12
Over 7/12 to 8/12
Over 8/12 to 9/12
Over 9/12 to 10/12
Over 10/12 to 11/12
Over 11/12 to 12/12
Over 12/12 to 14/12
Over 14/12 to 16/12
Over 16/12 to 18/12
Over 18/12 to 20/12
Over 20/12 to 21/12
22 TERMINATION LOCATIONS
Minimum height (H) from roof
Feet
Meters
1.0
0.30
1.25
0.38
1.5
0.46
2.0
0.61
2.5
0.76
3.25
0.99
4.0
1.22
5.0
1.52
6.0
1.83
7.0
2.13
7.5
2.27
8.0
2.44
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
#SP-34 L & MV R.9 April 2022