GE Mark VIe System Manual page 140

Hide thumbs Also See for Mark VIe:
Table of Contents

Advertisement

Leveling channels - If the enclosure is mounted on leveling channels, bond the channels to the woven wire mesh with
solid-steel wire jumpers of approximately the same gauge as the woven wire mesh. Bolt the enclosure to leveling channel,
front and rear.
Signal and power levels - Refer to section,
Cable Separation and
Routing, for guidelines.
Solid-bottom tray - Use steel solid bottom cable trays with steel covers for low-level signals most susceptible to noise.
Enclosure and Cable Tray Installation Guidelines
140
GEH-6721_Vol_I_BP
GEH-6721_Vol_I Mark VIe and Mark VIeS Control Systems Volume I
Public Information

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mark vies

Table of Contents