is written to the protection relay, the horizontal communication configuration needs to
be updated.
1.
Select GOOSE to update the GOOSE configuration part in the IED.
2.
Select whether or not to update the configuration.
Click Continue to update the selected communication configuration
part(s) in the IED. The options can be left unselected. In this case, other
parts of the configuration are updated.
Click Cancel to cancel the whole writing operation.
IEC 61850 version change while writing configuration to the
IED
If there is a version mismatch of IEC 61850 edition 1 and 2 between the IED
configuration and the PCM600 tool configuration while writing configuration to the
IED, a dialog opens showing the version mismatch information.
GUID-96D77BC1-011B-49BA-A5C2-4BEA3443A8FE V1 EN
Figure 65:
IEC 61850 version change
When making changes using PCM600 tools, for example Parameter Setting, the
version mismatch information is only shown in the PCM600 output window.