TRENDnet User's Guide

Switch Installation

DIN-Rail Installation

The site where the switch will be installed may greatly affect its performance. When
installing, consider the following pointers:
Note: The switch model may be different than the one shown in the example
illustrations.
 Install the switch in the appropriate location. Please refer to the technical
specifications at the end of this manual for the acceptable operating temperature
and humidity ranges.
 Install the Switch in a site free from strong electromagnetic field generators (such
as motors), vibration, dust, and direct exposure to sunlight.
 Install the switch in a location that is not affected by strong electromagnetic field
generators (such as motors), vibration, dust, and direct sunlight.
 Leave at least 10cm of space at the front and rear of the switch for ventilation.
Fasten the DIN-Rail bracket to the rear of the switch using the included
fasteners/screws.
Note: The DIN-Rail bracket may already be installed to your switch when received.
The movable clip at the top of the DIN-Rail bracket should be on top.
© Copyright 2016 TRENDnet. All Rights Reserved.
The switch can be installed to a 35mm (W) DIN-Rail located in cabinet, rack, or
enclosure.
To mount the switch to a DIN-Rail using the attached DIN-Rail bracket, position the
switch in front of the DIN-Rail and hook the bracket over the top of the rail.
Then rotate the switch downward towards the rail until your hear a click indicating the
bracket is secure and locked into place.
To unmount the switch from the DIN-Rail, slightly pull the switch downwards to clear
the bottom of the DIN-Rail and rotate away from DIN-Rail to unmount.