Led Indicators; Switch Installation; Desktop Hardware Installation - TRENDnet TPE-P521ES User Manual

5-port gigabit poe+ powered edgesmart switch with poe pass through
Table of Contents

Advertisement

TRENDnet User's Guide

LED Indicators

LED
State
Status
POWER
ON
When the POWER LED is on, the device is powered on.
(Green)
OFF
When the device is not receiving power, the PWR LED is OFF.
Ports 1-5
GREEN
Network speed at 1000 Mbps (Gigabit)
Right LED
AMBER
Network speed at 10/100 Mbps
(Link/Act)
BLINKING Data is transmitting/receiving.
OFF
Ethernet port is not connected.
Ports 1-2
GREEN
PoE power provided on this port.
Left LED
AMBER
PoE failed. There is an error providing PoE power.
(PoE Status)
OFF
No PoE power being provided.
Port 5
GREEN
PoE+ input detected from PSE
Left LED
AMBER
PoE input detected from PSE
(PoE-in Status)
© Copyright 2018 TRENDnet. All Rights Reserved.

Switch Installation

Desktop Hardware Installation

The site where you install the switch may greatly affect its performance. When
installing, consider the following pointers:
Note: Your switch model may be different than the one shown in the example
illustrations.
 Install the Switch in a fairly cool and dry place.
 Install the Switch in a site free from strong electromagnetic field generators (such
as motors), vibration, dust, and direct exposure to sunlight.
 Leave some space on the sides of the switch for ventilation.
 Install the Switch on a sturdy, level surface that can support its weight, or in an
EIA standard-size equipment rack. For information on rack installation, see the
next section, Rack Mounting.
 When installing the Switch on a level surface, attach the rubber feet to the
bottom of each device. The rubber feet cushion the hub and protect the hub
case from scratching.
TPE-P521ES
3

Advertisement

Table of Contents
loading

Table of Contents