Connecting Sunny Home Manager To Energy Meter With; S0 Interface - SMA SUNNY HOME MANAGER Installation Manual

Device for pv plant monitoring and load control
Hide thumbs Also See for SUNNY HOME MANAGER:
Table of Contents

Advertisement

7  Connection
• For bidirectional meters for feed-in and purchased electricity, insert the four-pole plug into
the connection socket "Meter 1".
3. Use the labels provided to mark each cable with the connection socket and energy meter to
which it is assigned.
7.2.2 Connecting Sunny Home Manager to Energy Meter with S0
Interface
Additional required material (not included in scope of delivery):
☐ A cable with at least two insulated conductors
Cable requirements:
☐ Conductor cross-section: 0.2 mm
☐ Maximum cable length: 30 m
Requirements for energy meters with an S0 interface:
☐ S0 interface in accordance with DIN EN 62053-31 class A
☐ Bidirectional meters with an S0 interface must use two S0 interfaces.
☐ Energy meters with an S0 interface must output balanced values at the S0 interface via the line
conductors. If necessary, contact the manufacturer of the energy meter.
☐ Recommended pulse length: at least 20 ms
☐ Recommended pulse length: 1,000 pulses per kWh. For the "limiting of the active power feed-in"
function, energy meters with an S0 interface must have the following pulse rates:
– For plants with a maximum allowed feed-in of more than 1,500 W:
at least 250 pulses per kWh
– For plants with a maximum allowed feed-in of less than 1,500 W:
at least 500 pulses per kWh
1. Remove 4 cm of cable sheath.
2. Shorten the cable shield to approximately 5 mm.
To do this, fold the surplus cable shield back onto
the cable sheath.
34
HoMan-IA-en-13
2
2
... 1.5 mm
SMA Solar Technology AG
Installation Manual

Advertisement

Table of Contents
loading

Table of Contents