Connecting The Network And Energy Meter - SMA SUNNY BOY STORAGE 2.5 Operating Manual

Battery inverter
Hide thumbs Also See for SUNNY BOY STORAGE 2.5:
Table of Contents

Advertisement

6 Electrical Connection
3. Unlock the DC connector. To do this, insert a flat-
blade screwdriver (blade width: 3.5 mm) into
the side catch mechanism and pry the catch
mechanism open.
4. Carefully pull the DC connector apart.
5. Release the clamping bracket. To do so, insert a
flat-blade screwdriver (blade width: 3.5 mm) into
the clamping bracket and pry the clamping
bracket open.
6. Remove the cable.
6.4

Connecting the Network and Energy Meter

Danger to life due to electric shock
Overvoltages (e. g. in the case of a flash of lightning) can be further conducted into the building
and to other connected devices in the same network via network cables or other data cables if
there is no overvoltage protection.
• Ensure that all devices in the same network and the battery are integrated in the existing
overvoltage protection.
• When laying the network cables or other data cables outdoors, attention must be given to
suitable overvoltage protection at the cable transition from the inverter or the battery
outdoors to the inside of a building.
Failure-free operation of all system components due to tethered connection
• To ensure failure-free operation, SMA Solar Technology AG recommends connecting all
system components with each other via Speedwire.
34
SBS25-1VL-10-BE-en-10
SMA Solar Technology AG
3
+
1
2
1
+
Operating Manual
2

Advertisement

Table of Contents
loading

Table of Contents