Mounting The Sunny Home Manager On The Top-Hat Rail - SMA SUNNY HOME MANAGER Installation Manual

Device for pv plant monitoring and load control
Hide thumbs Also See for SUNNY HOME MANAGER:
Table of Contents

Advertisement

SMA Solar Technology AG
6. Hook the Sunny Home Manager onto the screws.
Ensure that the heads of the screws are engaged in
the holes on the rear of the Sunny Home Manager.

6.4.2 Mounting the Sunny Home Manager on the Top-Hat Rail

Requirement:
☐ The top-hat rail is securely mounted on the wall.
1. Press the Sunny Home Manager with the upper
retainers into the upper edge of the top-hat rail.
2. Snap the lower retainers into the lower edge of the
top-hat rail.
Installation Manual
6  Installation
HoMan-IA-en-13
29

Advertisement

Table of Contents
loading

Table of Contents