Download Print this page

Installing The Control Valve - Toro 41339 Installation Instructions Manual

Bba compliance kit for multi-pro 1250 turf sprayer

Advertisement

3

Installing the Control Valve

Parts needed for this procedure:
1
Control valve
1
Control valve bracket
2
Phillips screw
1
Support bracket (for Multi-Pro Sprayers)
4
Flange-head bolt (1/4 x 3/4 inch)
4
Flange nut (1/4 inch)
1
Tee assembly
1
Pressure gauge
1
Barbed fitting (1/2 inch)
1
Retainer fork, large
Procedure
1. Remove hose large retainer fork to disconnect the
boom supply hose from the supply tee (Figure 3).
3
4
1. Supply tee
2. Hose retainer
3. Pressure gauge tube
2. Remove the four screws securing the supply tee to
the mounting bracket (Figure 4). Remove the supply
tee and hoses.
2
1
G005780
Figure 3
4. Tube fitting
5. Boom supply hose
G005781
1. Supply tee mounting
bracket
3. Install the new control valve into the open port
on the supply tee and secure it with a new retainer
(Figure 5).
5
1. Control Valve
2. Retainer fork, new
4. Connect the boom hose you disconnected in step 1
to the open port on the control valve and secure it
with the retainer you removed in 1 (Figure 5).
5. Remove the 2 bolts securing the supply tee mounting
bracket to the vehicle. Retain the fasteners.
6. Install the control valve bracket between the supply
tee bracket and the vehicle (Figure 6).
5
Figure 4
2. Screws
2
4
1
3
G005782
Figure 5
3. Boom hose
4. Retainer fork, existing
2
1
2

Advertisement

loading