Secton 8 - Fold Down Platform Ralngs
Page 21
Fold Down Platform Railings
Fold Down Platform Railings
ART_3137
ART_3138
ART_3139
3084ES Speed Level
Open the Loading Gate
1
•
Remove the 2 snap pins that
hold the loading gate to the side
guardrail.
Secure the Loading Gate
Swing the loading gate open
2
•
Secure the gate to the side
guardrail using 1 of the 2 snap
pins.
•
Return the other snap pin to its
place.
Release the Entry Rail
•
Remove the 2 snap pins from the
3
top corners of the entry guardrail.
•
Remove the 2 snap pins from the
base of the entry guardrail.
TM
- Operator's Manual
August 2020
Need help?
Do you have a question about the Speed Level 3084ES and is the answer not in the manual?