Secton 8 - Fold Down Platform Ralngs
Page 22
4
ART_3140
5
ART_3141
6
ART_3142
7
ART_3143
3084ES Speed Level
Lower the Entry Rail
•
Lower the entry guardrail to the platform
floor.
•
Return the snap pins to their places.
Release Left Side Rail
•
Remove the 3 snap pins from the base the
guardrail with the loading gate.
Lower Left Side Rail
•
Lower the guardrail and loading gate to
the platform floor.
•
Return the snap pins to their places.
Release and Lower Right Side Rail
•
Remove the 3 snap pins from the base of
the right side guardrail.
•
Lower the guardrail to the platform floor.
•
Return the snap pins to their places.
Reverse the procedure to erect the guardrails.