INSTALLATION INSTRUCTIONS
LOC TION OF FLUE TERMIN L FOR POWER FLUE
Listed below are the minimum clearances required for fan-assisted terminations:
1.
Below eaves, balconies and other projections. .........................................................200mm
1a.
Below eaves, balconies and other projections for a 1500 & 1800 model ..................300mm
2.
From the ground, above a balcony or other surface..................................................300mm
3.
From a return wall or external corner.........................................................................300mm
4.
From a Gas meter....................................................................................................1000mm
5.
From an electricity meter or fuse box. .......................................................................500mm
6.
From a drainpipe or soil pipe. ......................................................................................75mm
7.
Horizontally from any building structure or obstruction facing a terminal. .................500mm
8.
From any other flue terminal. Cowl, or combustion air intake. ..................................300mm
9.
Horizontally from any openable window, door, non-mechanical air inlet,
or any other opening into a building with the exception of sub floor ventilation.........300mm
10.
From a mechanical air inlet including a spa blower.................................................1000mm
11.
Vertically below an openable window, non-mechanical air inlet,
or any other opening into a building with the exception sub floor ventilation.............500mm
SHOULD THE SUPPLY FLEX AT THE BACK OF THE FIREBOX BE DAMAGED, A SPECIALLY
ELECTRIC L
PREPARED FLEX IS REQUIRED. FOR REPLACEMENT CONTACT THE MANUFACTURER.
THE ON/OFF WALL SWITCH MUST NEVER BE ATTACHED TO A METAL FRAME.
Whenever servicing the power flue system, always turn off the electrical power supply and
W RNING
close the manual gas control valve.
IMPORT NT INFORM TION
In addition to the instructions in this manual all national, state and local regulations must be
adhered to. These include but are not limited to:
• Australian Standards AS3000 - Electrical Installation.
• Australian Standards AS/NZS5601.1-2013 - Gas Installation.
• Local Gas and Electrical Authority Regulations.
• Municipal Building Codes.
The power flue should be serviced every 12 months by an authorised technician. If repairs
are needed an authorised technician must carry them out.
FITTING THE MOTOR
The Power Flue motor is fitted with two sets of spigots. The set on the base of the Power Flue box
sit on top of the vertical flue and the set mounted on the side plate connect to the horizontal flue.
The 1800, 3000 and 3300 units have a power flue motor with a 200mm spigot and a twin spigot of