Testing Redundancy; Wesmaint Cable Pinouts - GE D20 Installation And Operation Manual

Hide thumbs Also See for D20:
Table of Contents

Advertisement

D20/D200
Installation and Operations Guide
Connections and Configuration
Testing
Once you have correctly connected and configured your D20/D200 redundant
Redundancy
system, power up and test the system for fail over.
Universal
The UPC contains a jumper field that is configured specifically for each protocol.
Protocol
Jumpers are pre-set at the factory and should not have to be changed.
Converter
See the Configuration Guide for the protocol for the jumper settings that are
required.
WESMAINT
WESMAINT cable DB-9 connectors pinouts:
Cable Pinouts
88
, continued
994-0078-2.00-7
GE Energy
General
Full