D20/D200
Installation and Operations Guide
Getting Started: Required Steps
Installation
Before you begin to install your D20/D200, gather the required tools, equipment and
Tools,
accessories:
Equipment and
•
Flathead screwdriver with 0.6 x 3.5 mm blade (for terminal block wiring)
Accessories
•
#2 Phillips screwdriver (for rack mounting the unit)
•
Wire cutters (for field wiring)
•
Wire strippers (for field wiring)
•
Wire crimping tool (for field wiring)
•
Tie-wraps (for organizing wiring and cables)
•
Multimeter (for testing voltages and I/O points)
•
Needle nose pliers (for setting jumpers, for example)
•
PROM puller (only required if you are going to be upgrading or installing
PROMs in the field)
Depending on how you are going to be labeling your cables and wires, you may
need:
•
Heat shrink label printer
•
Heat gun (for shrinking)
12
, continued
994-0078-2.00-7
GE Energy
General
Full