D20/D200
Installation and Operations Guide
Connections and Configuration
WESTERM
The following table gives jumper settings for Z2 to Z39.
D20K: Settings
Jumper
Jumper
Jumper
Number
Position
Setting
Z2 & Z3
1 – 2
2 – 3
Z8
1 – 2
2 – 3
Z9
1 – 2
2 – 3
Z14
1 – 2
2 – 3
Z15
1 – 2
2 – 3
Jumper
Jumper
Number
Position
Z5 – Z7
1 – 2 & 3 – 4
Z19 – Z21
1 – 2
Z30 & Z31
2 – 3
Z4, Z10,
1 – 2 & 3 – 4
Z11, Z18,
1 – 2
Z22, Z29,
Z32, Z33
2 – 3
Z12, Z13,
1 – 2 & 3 – 4
Z23, Z24,
1 – 2
Z25, Z34,
Z35, Z36
2 – 3
Z16, Z17,
1 – 2 & 3 – 4
Z26, Z27,
1 – 2
Z28, Z37,
Z38, Z39
2 – 3
70
, continued
Option
1A
1B
1C
√
IN
√
IN
Option
2A
2B
2C
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
Jumper
Option
Setting
3A
3B
3C
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
√
IN
994-0078-2.00-7
Jumper Definition
Control O/P Source = D20 Peripheral DC Supply Voltage
Control O/P Source = External Source Supplied to TB1 – 1 & 54
T/C Configuration for Control O/P 1 – 8 = (T/C 1 – 8)
R/L Configuration for Control O/P 1 – 8 = (R/L 13 – 16)
T/C Configuration for Control O/P 9 – 16 = (T/C 9 – 16)
R/L Configuration for Control O/P 9 – 16 = (R/L 9 – 12)
T/C Configuration for Control O/P 17 – 24 = (T/C 17 – 24)
R/L Configuration for Control O/P 17 – 24 = (R/L 5 – 8)
T/C Configuration for Control O/P 25 – 32= (T/C 25 – 32)
R/L Configuration for Control O/P 25 – 32 = (R/L 1 – 4)
Jumper Definition
3D
T/C Configuration (T/C 1 – 8)
R/L Configuration (R/L 13 – 16)
Form C or Open Collector Control Outputs 1 – 8
T/C Configuration (T/C 9 – 16)
R/L Configuration (R/L 9 – 12)
Form C or Open Collector Control Outputs 9 – 16
T/C Configuration (T/C 17 – 24)
R/L Configuration (R/L 5 – 8)
Form C or Open Collector Control Outputs 17 – 24
T/C Configuration (T/C 25 – 32)
R/L Configuration (R/L 1 – 4)
Form C or Open Collector Control Outputs 25 – 32
GE Energy
General
Full