Vinten Vector 700 Maintenance Manual page 22

Pan and tilt head
Hide thumbs Also See for Vector 700:
Table of Contents

Advertisement

Contents
Routine checks and replacements
7
During normal use check the illumination of the level bubble. The battery should be replaced at yearly
intervals or whenever the illumination is considered inadequate.
Level bubble illumination unit battery replacement
8
The level bubble on the Vector 70H pan and tilt head is illuminated by a battery-powered light-emitting
diode (LED). A time-delay circuit initiated by a switch controls the LED. The battery should be replaced at
yearly intervals or whenever the illumination is considered inadequate.
NOTE: Dependent on the type of mounting, it may be necessary to remove the head from the
mounting for access to the battery compartment.
9
To install or replace the battery
9.1
Remove three screws
9.2
Install or replace the battery (2), pushing the connector
9.3
Position the battery in the battery compartment, ensuring that the wiring is not trapped.
9.4
Refit the battery cover plate (4), ensuring battery locates in cover plate. Secure with three screws
(1).
9.5
Press the switch and ensure the lamp is lit for approximately 15 seconds.
(4)
(3)
BATTERY TYPE: 9V,6LR61 (PP3, 6AM6, MN1604, E-BLOCK) Vinten Part No. C550-023
Fig 4.2 Level Bubble Illumination Unit Battery Replacement
(Fig
4.2):
(1)
which secure the battery compartment cover plate
First
Previous
Page
Page
(4)
(3)
onto the battery terminals.
Next
Previous
Page
View
to the head.
(1)
(2)
V70_BATT
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vector 700h

Table of Contents