Protective Earth Conductor Connection; Pe Connection According To Din En 61800-5-1; Connection Principle - Keba ServoOne CM-P BG1 Operation Manual

Passive supply unit
Table of Contents

Advertisement

4.4

Protective earth conductor connection

Step
Action
Each device in the axis group must be earthed!
x Connect together the PE connections on the supply unit,
1.
the axis controllers and the controller in series. Make
a connection from one of the devices to the PE rail (main
earth) in the switch cabinet
Connect the protective earth conductor connections on all other
2.
components, such as mains filter*), mains choke*) etc. in a star
topology to the PE rail (main earth) in the switch cabinet.
Please take into account the local and national regulations and
conditions. The minimum cross-section of the protective earth
3.
conductor must comply with the local safety requirements for
protective earth conductors in equipment with high leakage
current.
4.4.1

PE connection according to DIN EN 61800-5-1

The leakage current is > 3.5 mA. This situation results in the following minimum
requirements for the protective earth conductor cross-section as a function of the phase
conductor cross-section, as per EN 61800-5-1.
Cross-section of the phase conductors
Q ≤ 16 mm
2
16 < Q ≤ 35
Q > 35 mm
2
Q < 10 mm
2
Table 4.2
Protective earth conductor cross-section
ID no.: 1400.201B.5-00
Electrical installation
1
Electrical installation
Comment
x (see) Figure 4.4
*) Components are only required
for the SO CM-P supply unit.
Minimum cross-section of the protective earth
conductor
Q however at least 10 mm
(Cu)
2
16 mm
2
Q/2
Q x 2 PE lay doubled (see Figure 4.5)
or a copper wire of at least 10 mm
2
(Cu)
Date: 02/2020
4.4.2

Connection principle

4
1
5
7
Figure 4.4
Protective earth conductor connection on the ServoOne CM system
CAUTION!
Risk of injury due to incorrect wiring!
Carelessness may result in injuries.
The protective earth conductor connection is a safety feature. Therefore, make sure that all
connections have good contact and are sufficiently secure that they cannot come loose.
Operation Manual Supply Unit SO CM-P BG1+2
1. MotionOne CM controller
2. ServoOne CM-P supply unit
3. ServoOne CM axis
2
3
controller
4. Mains filter
5. Mains choke
6. Series earthing with
PE connectors
7. Star topology earthing
8. We recommend the
additional Cu strap
(1410..579.0) between
the mains filter and the
first component in the
row to improve the EMC
properties. See Figure 4.2.
6
6
PE
25