Routine Operation - Raven RS1/HDU Installation Manual

For rbr enterprise vector 300 ls/venturi ls
Table of Contents

Advertisement

FIGURE 25. Cable Routed to RS1
5. Plug the 12-pin connector into the mating connector on the RS1.
FIGURE 26. 12-Pin Connected to RS1
NOTE:
The 4-pin connector on the RS1 cable will not be used. Leave the dust cap on the connector.
NOTE:
If an ISO bed is on the machine, remove the terminator on the RS1 cable and plug the terminator
connector into the provided dust cap. If an ISO bed is not being utilized, leave the terminator on the
cable.

ROUTINE OPERATION

Locate and identify the machine's master switch on the control panel and the resume switch on the joystick as they
are required for RS1 system operation.
Cab Component Installation: Routine Operation
CAB COMPONENT INSTALLATION
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs1Hdu5035-002

Table of Contents