Install the System in the Rack.
38
Data Domain DD9500 System 5.7.1 High Availability (HA) System Installation and Upgrade Guide
CAUTION
To comply with Data Domain rack mounting guidelines, the system controller should
l
be installed in the pre-defined location for the system controller in the rack.
Do not apply AC power to the DD9500 system controller until all expansion shelves
l
and cables are installed.
Make sure the PSNT label, attached to the left rear of the chassis is not damaged or
l
snagged during the installation of the system into the rack.
Procedure
1. Identify the designated location for the system controller in the rack. See diagram for
the location shown with an arrow to place the DD9500 system.
Note
The designated slots in the rack shown with an arrow is the recommended location for
the DD9500 system to support the cabling shown in the diagram. Other locations may
require different cable lengths for some configurations. See the
expansion shelves and the controllers on page 48
connecting the expansion shelves to the controller. You must refer to the
Information on page 48
used to indicate a HOST port and the diamond
(Expansion) port. Refer to the EMC Data Domain ES30 Shelf Expansion Hardware Guide
and the EMC Data Domain DS60 Shelf Expansion Hardware Guide for detailed
instructions for cabling diagrams.
section to understand the markings used. The circle
Connecting the
section for the details about
Notes and
is used to indicate an EXP'N
is
Need help?
Do you have a question about the Data Domain DD9500 System and is the answer not in the manual?
Questions and answers