Basics and mounting
Mounting bus coupler
Proceeding
16
1.
Mount the mounting rail! Please consider that a clearance from the middle of the
mounting rail of at least 80mm above and 60mm below, respectively 80mm by
deployment of shield bus carriers, exist.
2.
Turn the locking lever upwards, place the bus coupler at the mounting rail and turn
the lever downward.
VIPA System SLIO
HB300 | IM | 053-1MT01 | en | 19-40