Installation/Setup; Unpacking And Assembly - Rice Lake LaserLight Series Installation Manual

Remote displays
Table of Contents

Advertisement

LaserLight Series
2.0

Installation/Setup

The LaserLight remote display can be set up and configured once it is mounted. This section describes basic installation,
AC wiring, RS-232, RS-485 and 20 mA current loop connections. Once installation setup is complete, see
page 11
for information on configuring the remote display.
The LaserLight has no on/off switch. Before opening the unit, ensure the power cord is disconnected from the
WARNING
power outlet.
Use a wrist strap to ground yourself and protect components from electrostatic discharge (ESD) when working
CAUTION
inside the enclosure.
This unit uses double pole/neutral fusing which could create an electric shock hazard. Procedures requiring
work inside the remote display must be performed by qualified service personnel only.
2.1

Unpacking and Assembly

Immediately after unpacking, visually inspect the LaserLight remote display for damage. If parts were damaged in shipment,
notify Rice Lake Weighing Systems and the shipper immediately. The main components of the LaserLight remote display
include:
• Powder coated steel or stainless steel enclosure
• Primary and secondary display boards
• Power supply
• Mounting panel for the CPU board (located on back of mounting plate)
Remove the protective plastic on the lens of the LaserLight as it obscures the display over time and becomes
IMPORTANT
very difficult to remove later on.
Figure 2-1. Mounting Plate Indicating Primary / Secondary Display Boards (7-Segment Display)
www.RiceLake.com
4
Visit our website
Primary Display
Secondary Display
Section 3.0 on

Advertisement

Table of Contents
loading

Table of Contents