Nice ALTO100C Instructions And Warnings For Installation And Use page 12

Gate automation
Table of Contents

Advertisement

15
7
11 – English
2
5
3.
1
it is aligned in contact with the travel stop and aligned with the other
leaf (if present). Caution! - If necessary, repeat point 2 to obtain per-
fect closure.
09.
a)
already performed in phase 08).
b) - Drill a hole in the leaf at the same point as the hole at the centre of the
bracke
the three screws fully down.
c)
10. Manually locking the gearmotor
a) - Manually move the leaf to approximately mid-travel and lock the
gearmotor by means of the special key (refer to chapter "Manually
locking and releasing the gearmotor" in the "Operation Manual").
Then manually move the leaf by a few centimetres in the opening
3
direction.
11. On 2-leaf gates.
a) - If the gate has two leafs, install the other gearmotor repeating all
operations described in paragraph 3.4 and in this paragraph.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alto100m

Table of Contents