Download Print this page

VERITAS NetBackup 5330 Hardware Service Procedure page 10

Hide thumbs Also See for NetBackup 5330:

Advertisement

HSP #133 Replacing a RAID canister in a Primary Storage Shelf or an Expansion canister in an Expansion Storage Shelf
15 Remove the air blocker in the empty slot in the Primary Storage Shelf.
To install a replacement RAID or Expansion canister
1
Slide the new canister all the way into the rear panel of the chassis.
The following image shows the insertion of an Expansion canister. The mechanism for installing
a RAID canister works the same way.
2
Rotate the levers towards the center of the canister to lock it into place.
3
Reinstall the Fibre Channel SFPs into the RAID canister. This step does not apply to the Expansion
canister.
Use the SFPs that you removed before you removed the original RAID canister.
Insert an SFP into an Fibre Channel port. You should not need to use the handle.
4
On the RAID or Expansion canisters, reconnect all of the cables that were removed from the
original canister.
5
Bring the replacement RAID canister online. If the canister does not come online, contact Veritas
Technical Support.
6
Look at the Service Action Required LEDs and Service Action Allowed LEDs.
If all of the Service Action Required LEDs are off, the procedure is completed.
If any of the storage shelf Service Action Required LEDs are on, or if the RAID canister Service
Action Required LED is on, check that the canister has been installed correctly and that all of
the cables are installed correctly. Reinstall the canister, if necessary.
7
Look at the seven segment displays on the new canister.
The display on the RAID canister should read "99."
10

Advertisement

loading

This manual is also suitable for:

Velocity 7330