Raven SmarTrax Installation Manual page 16

Buhler versatile 350/375/400/450/500/550 steering ready, my 2015 & newer
Hide thumbs Also See for SmarTrax:
Table of Contents

Advertisement

C
3
HAPTER
3. Route the 21-pin bulkhead connector on the node harness into the hole in the bottom of the compartment.
FIGURE 7. Node Harness Secured to Bulkhead
4. From outside the cab, secure the bulkhead connector to the machine using the lock nut on the connector.
FIGURE 8. Machine's Ground Bar
5. Locate the machine's ground bar on the right side of the compartment.
6. Install the two ground wires on the grounding bar.
7. Locate the fuse panel on the right side of the compartment.
8. Remove the bolt from the machine's power cable.
9. Install the two power wires from the node cable on the bolt.
NOTE:
It may be necessary to cut the ring terminals from the power wires and crimp new ring terminals (P/N
405-0200-052 or 405-0200-053) on the end.
10. Reinstall the machine's power cable on the bolt.
11. Reinstall the bolt in the fuse panel.
12. Loop and tie-off the REMOTE SWITCH cable connection, securing it with plastic cable ties as necessary.
NOTE:
The ENABLE and REMOTE SWITCH connectors are not used in the SmarTrax system. Ensure the cables
are secured away from moving parts and heat sources.
12
Buhler Versatile 350/375/400/450/500/550 Steering Ready, MY 2015 & Newer SmarTrax™ Installation