Hydraulic Installation - Norac Active Roll Control UC5 Series Installation Manual

Spray height control system
Table of Contents

Advertisement

6 Hydraulic Installation

Ensure all pressure has been bled from the system before disconnecting any lines
or fittings. Hydraulic pressure will exist on the wing tilt circuits unless the wings
are being supported by other means. You may wish to perform the hydraulic
installation with the wings in transport position, resting on the ground or with the
tilt cylinders fully extended.
Component failure due to oil contamination is not covered under the NORAC UC5
system warranty. It is recommended that a qualified technician perform the
hydraulic installation.
6.1
Valve Assembly
1. On a clean surface remove all plastic plugs from the block.
2. Install the orifice (F10) into the "A" port of the expansion block with the notch facing in.
3. Install the orifice (F11) into the "B" port of the expansion block with the notch facing in.
4. Install the 6MB-6MOR (F13) fittings into the "A" and "B" ports of the expansion block.
Tighten to 18 ft-lbs (24 Nm).
Figure 12: Expansion Block Orifice Orientation
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Active roll control uc5 jd 4930Active roll control uc5 jd 4940Active roll control uc5 jd 44952d

Table of Contents