Page 2
Reorder P/N: UC5-BC-HG07-INST Rev D (Hagie STS 90/100 2014+) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
Introduction Congratulations on your purchase of the NORAC UC5 Spray Height Control System. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
Technical Specifications CAN ICES-3(A)/NMB-3(A) This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules.
Kit Parts Kit Overview Figure 2: HG07 System Parts...
Page 8
Figure 3: HG07 Hydraulic Plumbing Do not use high speed power tools/drills when installing hardware. The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
Page 9
UC5-CAB-HG06-HG07 – HG06/HG07 Cab Kit Parts List (Hagie Kit Number – 693756) Item NORAC Part Number Hagie Part Number Name Quantity 43260-13 693142 CABLE UC5 NETWORK HAGIE STS CAB TO BULKHEAD 43250-19 693746 CABLE UC5 BATTERY 4-PIN DT FUSED (ECU & SIG)
Pre-Install Checklist The pre-install checklist is necessary to check the existing sprayer functionality before the installation. 1. Unfold the sprayer over a flat, unobstructed area (i.e. no power lines…etc.). 2. Ensure all boom-fold operations are functional (place a check mark in boxes below). 3.
Ultrasonic Sensor Installation Bracket Assembly Assemble the breakaway sensor bracket as illustrated in Figure 5, following the instructions below. Figure 5: Breakaway Bracket Assembly 1. Compress the spring and insert it together with the collar into the base. 2. Slide the tube through the assembled part. 3.
Page 13
Ultrasonic Sensor Serial Number Arrangement When installing the UC5 sensors, start with the smallest serial number on the left-hand side, and proceed to the largest serial number on the right hand side. Each UC5 sensor has a serial number stamped on the sensor housing. Apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
Page 14
Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error. These rules should be followed for both the wing sensors and the main lift (middle) sensor. 1. In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground (A). 2.
Page 15
2. Typically the best mounting location for the wing sensor brackets will be near the end of the boom tips, approximately two feet (60cm) from the end. 3. Mount the NORAC UC5 ultrasonic sensor into the sensor bracket and run the sensor cable through the sensor tube.
Page 16
Main Lift Sensor Installation Figure 9: Main Lift Bracket Assembly 1. There are a variety of ways to mount the main lift bracket on most sprayers. The bracket should position the sensor approximately in the center of the sprayer, forward of the boom.
Roll Sensor Installation Bracket Assembly 1. Securely mount the roll sensors to the Hagie roll sensor brackets using the #6 hex head machine screws provided (M05). Tighten screws to 10 in-lbs (1.1 Nm). 2. The roll sensor CANbus connector must be pointing towards the right side of the sprayer. Figure 11: Roll Sensor Orientation - Connector Facing Right Wing...
Page 18
Boom-Frame Roll Sensor Mounting 1. Install the roll sensor with the lowest serial number onto the bracket on the boom (Figure 12). The roll sensor must be mounted with the connector facing the right boom. Figure 12: Hagie Boom Frame Roll Sensor Mounting Ensure the boom frame roll sensor does not collide with any parts and the cable has sufficient slack for the boom to travel though its entire range of motion.
Page 19
Chassis Roll Sensor Mounting 1. Mount the roll sensor with the highest serial number on the bracket on the main sprayer chassis (Figure 13), with the cable facing the right hand wing. Figure 13: Hagie Chassis Roll Sensor Mounting...
Module Installation An optional module mounting bracket kit is available for purchase from NORAC. mounting brackets are compatible with control modules and input modules. One kit is needed per module. Item Part Number Name Quantity 43708 UC5 MOUNTING BRACKET KIT (CONTROL AND INPUT MODULES) Control Module 1.
Valve Module 1. Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin Deutsch (CANbus) connectors towards the “P” and “T” ports with the label facing up. Output Number Normal Function Left Up Left Down...
Page 22
8. Connect the 2-pin Deutsch plugs labeled “SOL 1”, “SOL 2”, “SOL 3” and “SOL 4” on C10 to the NORAC valve block connectors. 9. Connect the 2-pin Deutsch plug labeled “SOL 5” on C10 to the Hagie Main Up connector.
Page 23
10. Connect the 2-pin Deutsch plug labeled “SOL 6” on C10 to the Hagie Main Down connector. 11. Route the 12-pin Deutsch connector on C10 toward the input module. 12. Insert the 2-pin plug (P01) into the unused 2-pin connector on output 8. 13.
Page 24
Input Module 1. Install the input module (E03) on the boom near the sprayer valve block. Secure it to the bracket beside the valve block (Figure 19). 2. Connect the free end of the CANbus cable (C05) from the valve module to the input module.
Connecting the Sensors to the CANbus 1. Fasten the 8-way coupler (E11) to the boom with cable ties. 2. Connect cable C05 from the input module to the 8-way coupler. 3. Connect the boom frame roll sensor to the 8-way coupler. Connect the chassis roll sensor to the 3-way coupler between cables C03 and C09.
Component failure due to oil contamination is not covered under the NORAC UC5 system warranty. It is recommended that a qualified technician perform the hydraulic installation.
Page 27
10.2 Valve Block Mounting 1. Install the valve block (V01) onto the plate near the Hagie valve block. Hagie Valve Block NORAC Valve Block Figure 23: Valve Block Mounting...
Page 28
3. Connect four hydraulic hoses from the free end of the tees to the NORAC valve block. The raise lines must be connected to the “B” ports and the lower lines must be connected to the “A”...
11 Software Setup 1. Start up the sprayer and test the sprayer’s functionality. The display terminal does not need to be powered on for the original boom function switches to operate. Unfold the booms and raise/lower each boom and the main section. Confirm that the cabling and hoses are agreeable to the entire range of motion.
Page 40
Canada NORAC Systems International Inc. Phone: (+1) 306 664 6711 Toll Free: 1 800 667 3921 Shipping Address: 3702 Kinnear Place Saskatoon, SK S7P 0A6 United States NORAC, Inc. Phone: (+1) 952 224 4142 Toll Free: 1 866 306 6722 Shipping Address: 6667 West Old Shakopee Rd., Suite 111...
Need help?
Do you have a question about the UC5-CAB-HG06-HG07 and is the answer not in the manual?
Questions and answers