Wacker Neuson E 2200 Operator's Manual page 97

Hydronic surface heater
Table of Contents

Advertisement

E 2200, E 3000ES
Continued from the previous page.
Fill the HTF
5. Move and hold the bypass switch (x) in the ON position. HTF will begin to flow.
reservoir
When the HTF is level is between the minimum and maximum marks on the
sightglass (c):
a. Pull the fill hose from the HTF supply.
b. Release the bypass switch.
NOTICE: Do not overfill the HTF reservoir. Doing so may damage the machine.
x
Prepare
After filling the HTF reservoir, perform the procedure below to prepare the machine
machine for
for operation.
operation
1. Press the low-level shut-down reset button (a) if the red LED (b) is lit.
2. Move the operation valve (2) to the OPEN position.
3. Move the fill valve (3) to the CLOSED position and insert the pin.
4. Clean the fill hose, and cap the fill hose if a cap is provided.
5. Return the fill hose to its storage location under the hose reel.
Result
The machine is now ready for operation.
wc_tx001670gb.fm
wc_gr008068
a
b
wc_gr008077
97
Maintenance
MAX
MIN
wc_gr008120
2
3
wc_gr007810

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E 3000es

Table of Contents