Wacker Neuson E 2200 Operator's Manual page 78

Hydronic surface heater
Table of Contents

Advertisement

Burner Setup
Continued from the previous page.
When
Adjust the burner:
Before operating the machine at elevations 305 m (1,000 ft) above or below the
location of the previous adjustments
Before starting at a new job site
After any burner maintenance or repair has been performed
If burner performance is in question
Procedure
Follow the procedure below to set up the burner.
1. Shut down the machine.
2. Set the burner electrodes.
(See topic 6.1 Adjusting the Burner Electrodes.)
3. Check the burner nozzle.
(See topic 6.2 Replacing the Burner Nozzle.)
4. Check/set the "Z" distance.
(See topic 6.3 Setting the "Z" Distance)
5. Set the air settings.
(See topic 6.4 Adjusting the Air Settings.)
6. Start the machine and the burner.
7. Check/set the fuel pressure.
(See topic 6.5 Setting the Fuel Pressure.)
8. Conduct a smoke spot test. Follow the smoke spot tester manufacturer's
instructions and the general guidelines below.
Use the access hole in the exhaust stack.
Several samples should be taken as the heater warms.
The final sample should be taken just before the heater reaches 71°C (160°F).
This procedure continues on the next page.
E 2200, E 3000ES
78
wc_tx001669gb.fm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E 3000es

Table of Contents