Wacker Neuson E 2200 Operator's Manual page 56

Hydronic surface heater
Table of Contents

Advertisement

Operation
Continued from the previous page.
4. Place the open end of the fill hose into a container of HTF.
5. Move and hold the bypass switch (x) in the ON position. HTF will begin to flow.
When the HTF level is between the minimum and maximum marks on the
sightglass:
a. Pull the fill hose from the HTF supply.
b. Release the bypass switch.
NOTICE: Do not overfill the HTF reservoir.
x
Prepare
After filling the HTF reservoir, perform the procedure below to prepare the machine
machine for
for operation.
operation
1. Press and release the "RESET" button (d) on the low-level shut-down device.
The following will occur:
This procedure continues on the next page.
wc_gr008068
The "POWER" (green) (f) and "LOW WATER" (red) (e) lights will blink for
fifteen seconds while the low-level shut-down device performs a self-
diagnostic test.
After 15 seconds, the "LOW WATER" light will go out—the "POWER" light will
stay on.
The low HTF level indicator will go out.
Power will be returned to the pump circuit.
Power will be returned to the burner circuit.
E 2200 / E 3000ES
56
wc_tx001667gb.fm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E 3000es

Table of Contents