Step 3
Place one of the Main table sections upside down
on a debris-free carpeted area or blanket. Make sure
the tabletop is upside down before you continue.
Your tabletop has pre-drilled holes and threaded in-
serts that should be visible and facing up. Align the
holes in one Side bracket (C4) with the threaded
C4
inserts on one side of the tabletop.
Note: Be careful to not overtighten screws, as this
could cause the threads on the Machine screws to
become stripped. Rotate each screw by hand for
only a few turns to avoid cross-threading.
Attach it in the orientation shown with four #10-
24x3/4'' Machine screws (H4b) and four Washers (H5).
H1
Step 4
Slide two Leg assemblies from Step 2 onto the tabs
of the Side bracket. Connect them to the Side bracket
with four M6x10 Machine screws (H1).
Rotate each screw by hand for only a few turns to
avoid cross-threading. Once the four screws are start-
ed, tighten all the way using the 4mm Allen wrench
(H6).
Repeat Steps 3 and 4 with the other Main table sec-
tion and the remaining Leg assemblies.
Step 5
Orient all the Crossbar rails (C3) so that the Center
indicator marks are facing up. When pairing two rails
together, make sure the slots are facing towards each
other.
Center indicator marks
Step 6
Note: The Leaf table section is not required for Bam-
boo Conference tables, but it is required for Confer-
ence Ping Pong tables. If you are assembling a Con-
ference table without the Leaf table section, the same
basic assembly steps will apply.
Position the two Main table assemblies and the Leaf
table section (if used) with the four Crossbar rails on
the blankets, as shown.
Slide the table top sections together ensuring that the
four Crossbar rails are inserted into the Crossbar ends
on each side.
6
© UPLIFT Desk • 800-349-3839 • 512-614-3152 • info@upliftdesk.com • upliftdesk.com
Need help?
Do you have a question about the V2 Height Adjustable Bamboo Conference Table and is the answer not in the manual?
Questions and answers