Operating Procedures; Start-Up - Nidek Medical ICE mini Operator's Manual

Intelligent blocker
Table of Contents

Advertisement

2.

OPERATING PROCEDURES

2.1

Start-up

1
Connect the power cord to the inlet.
2
Make sure that the power switch is turned off
(
) and connect the power cord to a wall
outlet.
3
Make sure that the cables from the connected instruments are securely connected to the
ICE mini, and the power for each instrument is turned on.
See "4.2 Connection" (Page 67) for the connecting method.
4
Turn on (
1) The blocker starts to initialize, and "ICE
mini" is displayed on the LCD touch
screen.
Wait for a while until the screen changes with-
out touching the ICE mini.
• The electrical outlet must have a grounding terminal.
Electric shock or fire may occur in the event of instrument failure or electric leak.
• Never overload the electrical outlet.
A branch outlet that is concurrently used with other instruments may cause overheating and fire.
) the power switch.
Power switch
Inlet
ICE mini
2
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents