Component to be inspected
Suppression system

HP POD 40c NA structure

Component to be inspected
Complete structure

Life safety

Component to be inspected
Manual EPO shunt trip
Thermal EPO shunt trip
Task
Suppression system test
Fire-pull visual and operational
inspection
Fire strobe and horn visual and
operational inspection
Task
Visually inspect the structural
integrity.
Inspect the door operation and
inspect the door gaskets for water
and air leaks.
Visually inspect the paint. Perform
prep and touch-up as necessary.
Task
EPO FUNCTIONAL TEST (POD will
power down)
Manually initiate EPO with the
internal and external push buttons
(if installed) in succession. (Verify
all shunt-trips on all panels trip.)
EPO FUNCTIONAL TEST (POD will
power down)
Initiate a thermal (automatic) EPO
shutdown via the EPO
temperature switches located in
the hot aisle. (Verify all shunt-trips
on all panels trip.)
Frequency
Capable Party
As required by
Authorized technician
local code
As required by
Authorized technician
local code
As required by
Authorized technician
local code
Frequency
Capable Party
Annually
Qualified personnel
Annually
Qualified personnel
Annually
Qualified personnel
Frequency
Capable Party
Annually
Qualified personnel
Annually
Qualified personnel